تجاوز إلى المحتوى
Back to projects
In progress

Solar energy project - "The estimated cost is $50,000. "

Driven by our shared responsibility, the Unified Financial Committee in Al-Qurayya calls on all members of our community abroad to urgently contribute to funding the alternative energy project, which—according to studies conducted by specialists—is considered the most efficient and optimal solution for securing a sustainable water supply and alleviating the community’s hardships. For direct transfers from abroad, please contact: Suleiman Al-Debs: 0932331896 Samer Zeitouna: 0932313609 Osama Al-Zaqout: 0933781856"

مشروع طاقه شمسيه

Next Steps:

  • Step 1: Complete the project funding.

  • Step 2: Select the most viable well.

  • Step 3: Publish the studies, expected figures, and anticipated benefits.

  • Step 4: Start purchasing the equipment (all details will be shared with full transparency).

  • Step 5: Installation, testing, and publication of the results.

Milestones

  1. December 31, 2012

  2. November 20, 2025

    Funding

    55% of the targeted amount has been collected from contributors inside and outside the town.

  3. November 27, 2025

    Project Status

    As of today, none of the project equipment has been purchased, pending the approval of the most suitable and most efficient well for continuous operation using solar energy.